Short timelines

As always I’m in a hurry and a flurry.

The fabric that arrived last week has been cut and stitched into blocks.

20120822-203556.jpg

Those blocks have been stitched into rows.

20120822-203704.jpg

Those rows were stitched into a quilt top.

20120822-203806.jpg

The whole thing has been quilted…

20120822-203907.jpg

and approved by the quality controller.

20120822-204018.jpg

Onto the binding.

5 Comments

Filed under longarm quilting, quilting

5 responses to “Short timelines

  1. Lori Smanski

    this is absolutely adorable. You are doing a wonderful job.

  2. Aunty Evil

    Beautiful!

  3. Debbie

    I love this quilt, those little animals are so cute, and of course your Quality Control Officer :) I have one of those too, a 35kg boxer girl, no sooner than the quilt top is on the floor, she’s on it!!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s